Assign a Default Reporting Period
If several projects within a workspace will use the same reporting cycle, you can set a default reporting cycle for all new projects within the workspace to inherit. This can be changed at the project level.
To assign a default reporting period:
- In the object selector, select
Workspace.
- In the object selector, beside a workspace name, select , and then select
View Summary & Settings.
- On the Summary & Settings page, select Dictionaries, and then select Reporting Cycles.
- Select Default for the reporting cycle that you want to be the default.
- Select Save.
This setting is used in the following apps:
![]() |
![]() |
Last Published Monday, March 17, 2025