Set the EPS Code for a Workspace Connected with P6 EPPM
When exporting a project from Oracle Primavera Cloud into P6 EPPM, the location where the project will reside in the Enterprise Project Structure (EPS) must be defined. This is done using an EPS Code set at the workspace level. Use the Synchronize page to run the Create EPS Code in Primavera Cloud synchronization business flow.
To set the EPS Code:
- In the object selector, select
Workspace, select View Workspaces List, and then select a workspace name.
- From the
Main Menu, select
Integration, and then select Synchronize.
- Note: The selected workspace must have a P6 EPPM connection with the Create EPS Code in Primavera Cloud business flow enabled.
- Select the Create EPS Code in Primavera Cloud row, select the
Context menu, and then select Run.
- Monitor the business flow job on the Monitor page.
- After the business flow job has completed, in the sidebar, select
Summary & Settings.
- On the Summary and Settings menu, select Dictionaries, and then select Codes.
- Verify that the table contains the P6 EPS code.
Last Published Monday, March 17, 2025